Document AI, powered by the world’s best OCR.

Enterprise-grade document processing with state-of-the-art OCR and structured data extraction. Faster processing, higher accuracy and lower costs — at any scale.

027e3e31-f41b-43a4-b18a-9d3dcb0614f9

Why Mistral for Document AI?

icon-accuracy-beige

Superior document accuracy

 

Extract and understand complex text, handwriting, tables, and images from any document, with 99%+ accuracy across global languages.

icon-iightning-beige

Faster processing, at predictable cost

 

Process up to 2,000 pages per minute on a single GPU, with minimal latency and cost-efficient throughput.

icon-copy-beige

Transform your document operations for true scale and intelligence

 

Integrate OCR with Mistral’s powerful AI tooling to enable flexible, full document lifecycle workflows, and make your archives instantly accessible.

Try out Document AI

Select from our range of sample documents to see Document AI and OCR in action.

Contract

PDF - 3 pages

ARTICLE VI - RECORDS AND AUDITS

The ENGINEER shall maintain books, accounts, records, documents and other evidence pertaining to the costs and expenses allowable under this Agreement in accordance with generally accepted accounting practices. The ENGINEER shall organize the accounts pertaining to these costs and expenses in accordance with the Project Code of Accounts to provide segregation in accordance with the Federal Energy Regulatory Commission (FERC) Uniform System of Accounts, prescribed for utilities and licenses, dated January 1, 1970, and in such detail as to reflect all net actual direct costs (including applicable credits) incurred for labor, materials, equipment, services, supplies, payroll/salary related costs, application of overhead rates and any and all other costs and expenses of whatever nature for which payment is claimed under the provisions of this AGREEMENT. ENGINEER'S annually published Schedule of Computer and Major Equipment Rates and its annually published Schedule of Materials Engineering Laboratory Rates shall be applied as published, but excluded from audit as to cost composition. Similarly, cost composition of the Overhead Rates fixed in Article IV Subsection A.2 and A.3 shall not be subject to audit. All such books of account and records required to be maintained by this AGREEMENT shall be subject to inspection and audit by representatives of the OWNER and of the Bonneville Power Administration at all reasonable times, and the ENGINEER shall afford the proper facilities for such inspection and audit. Such books of account and records may be copied by OWNER where necessary to conduct or document an audit, provided, however, that any such copies shall be protected by OWNER as "proprietary data" under Article XXV.

The ENGINEER shall preserve and make available all such books of account for a period of three (3) years after final payment under this AGREEMENT.

ARTICLE VII - CHANGES AND FEE ADJUSTMENTS

A. BASELINE

The parties agree that the baseline upon which the fees are based is that contained in the 1982 Plant Construction/Design Cost Estimates At Completion for Projects Nos. 3 and 5 which includes schedule and contingency; plus normally anticipated design, procurement and construction activities for the Projects. The parties further agree that the goal of achievement of Commercial Operation within that Budget and schedule is best achieved by an incentive fee program with no provision for additional fee except for "changes".

WASHINGTON PUBLIC POWER SAFELY SYSTEM

RICHLAND, WASHINGTON

AGREEMENT

THIS AGREEMENT, made and entered into by and between Washington Public Power Supply System, a municipal corporation, 3000 George Washington Way, Richland, Washington, hereinafter called the "OWNER", and Mercury Company of Norwood, Incorporated, a corporation, with its principal offices located at 10 Burke Drive, in the City of Brockton, State of Massachusetts, hereinafter called the "CONTRACTOR".

WITNESSETH

WHEREAS, the OWNER has caused the preparation of certain Contract Documents designated "Bidding Documents and Plans and Specifications, Control Boards and Cabinets, Washington Public Power Supply System Nuclear Projects 3 and 5, Conformed Contract No. 3240-59, dated July 26, 1979."

WHEREAS, the OWNER has advertised for bids from Bidders of the specified equipment, and has received said bids, has analyzed the same, and has duly given Notice of Award and awarded a Contract to the Contractor as herein set forth and as stated more in detail in the Contract Documents, all of which Contract Documents are attached hereto and made a part of hereof and which constitute the whole contract between OWNER and CONTRACTOR.

NOW, THEREFORE, it is hereby agreed that:

(a) CONTRACTOR shall furnish all requirements of the Contract in the manner specified in the Contract Documents.

(b) OWNER shall pay to CONTRACTOR in accordance with schedule of prices at the time and in the manner and upon the

A-1

III. BACKGROUND (Continued)

A. Sequence of Events (Continued) 6. Contractor provided cost summary in WZUE-82-012 dated December 7, 1982 (Attachment 7). The letter gives the non recurring cost (and its breakdown) from which the Contractor estimated to obtain the Contract Price. 7. Additional information from Contractor via WZUE-83-001 dated February 3, 1983 (Attachment 8) supplementing the December 7, 1982 proposal. 8. Additional information from Contractor via WZUE-83-004 dated February 22, 1983 (Attachment 9). 9. Fact Finding Meeting, of April 13, 1983 documented in (Attachment 10). 10. Memo to file dated June 21, 1983 (Attachment 11)

B. Status of Equipment, Engineering, Material, Manufacturing

Status
1.EquipmentWNP-1WNP-4
Cabinet Assemblies (SREX & SREY)DeliveredNot Started*
Prefab Instr. Cables (SREX & SREY)DeliveredNot Started*
Safety Related Accessory Cabinet (SRAC)DeliveredNot Started*
Ftbre Optic Links (FOL)DeliveredNot Started*
Radwaste Instr. Cabinet Assembly (RWIC)DeliveredNot Started*
BOP Instr. Cabinet Assy. (BOPC)DeliveredNot Started*
Prefab Instr. Cables BOPC23 mo. after  Dwg approval \begin{aligned} & 2-3 \text { mo. after } \\ & \text { Dwg approval } \end{aligned}Not Started*
PAS CabinetsDeliveredDelivered
  • (Will not be completed due to termination).
EngineeringStatus

All Engineering including design, development and qualification work will not be impacted by WNP-4 termination. a) Design and Development

  • Seismic Testing/Aging Ongoing
  • Test Instructions Complete
  • Drawing Documentation 95% Complete

Precision document intelligence, built for scale.

Extract, understand and structure documents, combining exceptional accuracy, multilingual support and processing speeds.

Enterprise OCR

Digitize text from PDFs, scans, DOCX, PPTX, and more — even from low-quality or handwritten sources.

72bed1e7-4f8f-47ea-b3f1-b5357e5869f0

SOTA doc AI

Go beyond raw text extraction. Our AI interprets tables, forms, invoices, and complex layouts with unprecedented accuracy and cognition.

706530d8-cd26-4916-a8ec-35f5db797ddd

Advanced extraction

Extract to structured JSON with custom templates: parse forms, classify documents, and process images (text, charts, signatures). Convert charts to tables, extract fine print from figures, or define custom image types.

a904eb93-8442-4d2b-82fd-cf80bfb427ff

Multilingual, multimodal

World-class multilingual OCR: outperforms other solutions with 99%+ accuracy across 11+ languages.

a680af0f-4802-41e6-9845-3aa6f7f3050d

Fastest in category

Lightweight and blazing fast — Mistral OCR processes up to 2,000 pages per minute on a single GPU, outperforming bulkier alternatives without sacrificing accuracy.

4e573163-f46d-4840-9824-d60aa882c866

Fine-tunable

Improve accuracy for domain-specific documents (e.g., medical records, legal contracts) with trainable OCR and tailored extraction rules.

d8587376-840e-4e0a-adcd-fe939e3f00b6

For industries needing precision, speed, and compliance in document workflows.

Regulated sectors needing audit-ready data extraction.

icon-earth-black

Global enterprises processing multilingual documents in large volumes.

icon-lab-beaker

Researchers and academic institutions transforming PDFs into structured datasets.

icon-briefcase

Compliance-first organizations requiring secure on-premises deployment.

 

cbf8094c-8a3e-41df-b804-78ea1cfa6271

Deploy Document AI on-premises or in a private cloud to meet strict compliance and data sovereignty requirements.

Use cases.

Document-to-data, at scale

Convert physical documents (contracts, invoices, forms, and reports) to custom-structured digital copies in minutes.

3eac96d8-5b62-4915-b657-a89136756d33

Extract and analyze

Enable AI-powered insights: detect patterns, validate data, and enhance enterprise search out of scanned documents.

49fb501d-6e84-4f4f-a174-5cb324c07f40

Translate and localize

Quickly localize contracts, reports, and correspondences across, with compliance-ready accuracy.

55fbfa9f-a138-4a1b-9e8c-ddc8a9e3ac42

Automate workflows with AI

Build end-to-end document pipelines — from OCR digitization to natural language querying, with fully automated structuring in-between.

8388dc56-6644-4709-8d1c-f00884477f5e

Monitor compliance and manage risk

Automatically audit document flows, redact sensitive data, or enforce retention policies, while keeping full traceability.

2c9c19bd-989b-4383-8796-4bbcff6cdd19

Get started with Document AI

chat-orange

Try Mistral Document AI for free on le Chat.

desktop-orange

Explore our APIs on La Plateforme.

quote-orange

Contact us to discuss enterprise deployments.

Extract structured text from PDFs while preserving layouts.

Annotate for bounding boxes or entire documents.

 

Ask questions and extract insights from documents using natural language.

Process documents in bulk with Batch OCR.

Data extraction with structured outputs.

Understand documents with Q&A or summarization.