-
Solutions
-
Document AI
Document AI, optimisé par l'OCR le plus performant au monde.
Document AI, optimisé par l'OCR le plus performant au monde.
Traitement de documents de niveau professionnel grâce à une technologie OCR de pointe et à l'extraction de données structurées.
Contract
Table
Invoice
Handwriting
Contract
ARTICLE VI - RECORDS AND AUDITS
The ENGINEER shall maintain books, accounts, records, documents and other evidence pertaining to the costs and expenses allowable under this Agreement in accordance with generally accepted accounting practices. The ENGINEER shall organize the accounts pertaining to these costs and expenses in accordance with the Project Code of Accounts to provide segregation in accordance with the Federal Energy Regulatory Commission (FERC) Uniform System of Accounts, prescribed for utilities and licenses, dated January 1, 1970, and in such detail as to reflect all net actual direct costs (including applicable credits) incurred for labor, materials, equipment, services, supplies, payroll/salary related costs, application of overhead rates and any and all other costs and expenses of whatever nature for which payment is claimed under the provisions of this AGREEMENT. ENGINEER'S annually published Schedule of Computer and Major Equipment Rates and its annually published Schedule of Materials Engineering Laboratory Rates shall be applied as published, but excluded from audit as to cost composition. Similarly, cost composition of the Overhead Rates fixed in Article IV Subsection A.2 and A.3 shall not be subject to audit. All such books of account and records required to be maintained by this AGREEMENT shall be subject to inspection and audit by representatives of the OWNER and of the Bonneville Power Administration at all reasonable times, and the ENGINEER shall afford the proper facilities for such inspection and audit. Such books of account and records may be copied by OWNER where necessary to conduct or document an audit, provided, however, that any such copies shall be protected by OWNER as "proprietary data" under Article XXV.
The ENGINEER shall preserve and make available all such books of account for a period of three (3) years after final payment under this AGREEMENT.
ARTICLE VII - CHANGES AND FEE ADJUSTMENTS
A. BASELINE
The parties agree that the baseline upon which the fees are based is that contained in the 1982 Plant Construction/Design Cost Estimates At Completion for Projects Nos. 3 and 5 which includes schedule and contingency; plus normally anticipated design, procurement and construction activities for the Projects. The parties further agree that the goal of achievement of Commercial Operation within that Budget and schedule is best achieved by an incentive fee program with no provision for additional fee except for "changes".
WASHINGTON PUBLIC POWER SAFELY SYSTEM
RICHLAND, WASHINGTON
AGREEMENT
THIS AGREEMENT, made and entered into by and between Washington Public Power Supply System, a municipal corporation, 3000 George Washington Way, Richland, Washington, hereinafter called the "OWNER", and Mercury Company of Norwood, Incorporated, a corporation, with its principal offices located at 10 Burke Drive, in the City of Brockton, State of Massachusetts, hereinafter called the "CONTRACTOR".
WITNESSETH
WHEREAS, the OWNER has caused the preparation of certain Contract Documents designated "Bidding Documents and Plans and Specifications, Control Boards and Cabinets, Washington Public Power Supply System Nuclear Projects 3 and 5, Conformed Contract No. 3240-59, dated July 26, 1979."
WHEREAS, the OWNER has advertised for bids from Bidders of the specified equipment, and has received said bids, has analyzed the same, and has duly given Notice of Award and awarded a Contract to the Contractor as herein set forth and as stated more in detail in the Contract Documents, all of which Contract Documents are attached hereto and made a part of hereof and which constitute the whole contract between OWNER and CONTRACTOR.
NOW, THEREFORE, it is hereby agreed that:
(a) CONTRACTOR shall furnish all requirements of the Contract in the manner specified in the Contract Documents.
(b) OWNER shall pay to CONTRACTOR in accordance with schedule of prices at the time and in the manner and upon the
A-1
III. BACKGROUND (Continued)
A. Sequence of Events (Continued) 6. Contractor provided cost summary in WZUE-82-012 dated December 7, 1982 (Attachment 7). The letter gives the non recurring cost (and its breakdown) from which the Contractor estimated to obtain the Contract Price. 7. Additional information from Contractor via WZUE-83-001 dated February 3, 1983 (Attachment 8) supplementing the December 7, 1982 proposal. 8. Additional information from Contractor via WZUE-83-004 dated February 22, 1983 (Attachment 9). 9. Fact Finding Meeting, of April 13, 1983 documented in (Attachment 10). 10. Memo to file dated June 21, 1983 (Attachment 11)
B. Status of Equipment, Engineering, Material, Manufacturing
| Status |
|---|
| 1. | Equipment | WNP-1 | WNP-4 |
|---|---|---|---|
| Cabinet Assemblies (SREX & SREY) | Delivered | Not Started* | |
| Prefab Instr. Cables (SREX & SREY) | Delivered | Not Started* | |
| Safety Related Accessory Cabinet (SRAC) | Delivered | Not Started* | |
| Ftbre Optic Links (FOL) | Delivered | Not Started* | |
| Radwaste Instr. Cabinet Assembly (RWIC) | Delivered | Not Started* | |
| BOP Instr. Cabinet Assy. (BOPC) | Delivered | Not Started* | |
| Prefab Instr. Cables BOPC | $\begin{aligned} & 2-3 \text { mo. after } \ & \text { Dwg approval } \end{aligned}$ | Not Started* | |
| PAS Cabinets | Delivered | Delivered |
- (Will not be completed due to termination).
| Engineering | Status |
|---|
All Engineering including design, development and qualification work will not be impacted by WNP-4 termination. a) Design and Development
- Seismic Testing/Aging Ongoing
- Test Instructions Complete
- Drawing Documentation 95% Complete
JSON Output
{
"document_type": "Contract Agreement",
"description": "This document outlines an agreement between Washington Public Power Supply System (Owner) and Mercury Company of Norwood (Contractor). It details the responsibilities of the Contractor to maintain records and accounts related to costs and expenses, adhere to accounting practices, and allow audits by the Owner. The agreement also specifies the baseline for fees and the conditions under which changes and fee adjustments can occur. Additionally, it includes background information on the sequence of events and the status of equipment, engineering, material, and manufacturing.",
"prepared_by": "Washington Public Power Supply System"
} Raw Markdown
# ARTICLE VI - RECORDS AND AUDITS The ENGINEER shall maintain books, accounts, records, documents and other evidence pertaining to the costs and expenses allowable under this Agreement in accordance with generally accepted accounting practices. The ENGINEER shall organize the accounts pertaining to these costs and expenses in accordance with the Project Code of Accounts to provide segregation in accordance with the Federal Energy Regulatory Commission (FERC) Uniform System of Accounts, prescribed for utilities and licenses, dated January 1, 1970, and in such detail as to reflect all net actual direct costs (including applicable credits) incurred for labor, materials, equipment, services, supplies, payroll/salary related costs, application of overhead rates and any and all other costs and expenses of whatever nature for which payment is claimed under the provisions of this AGREEMENT. ENGINEER'S annually published Schedule of Computer and Major Equipment Rates and its annually published Schedule of Materials Engineering Laboratory Rates shall be applied as published, but excluded from audit as to cost composition. Similarly, cost composition of the Overhead Rates fixed in Article IV Subsection A.2 and A.3 shall not be subject to audit. All such books of account and records required to be maintained by this AGREEMENT shall be subject to inspection and audit by representatives of the OWNER and of the Bonneville Power Administration at all reasonable times, and the ENGINEER shall afford the proper facilities for such inspection and audit. Such books of account and records may be copied by OWNER where necessary to conduct or document an audit, provided, however, that any such copies shall be protected by OWNER as "proprietary data" under Article XXV. The ENGINEER shall preserve and make available all such books of account for a period of three (3) years after final payment under this AGREEMENT. # ARTICLE VII - CHANGES AND FEE ADJUSTMENTS ## A. BASELINE The parties agree that the baseline upon which the fees are based is that contained in the 1982 Plant Construction/Design Cost Estimates At Completion for Projects Nos. 3 and 5 which includes schedule and contingency; plus normally anticipated design, procurement and construction activities for the Projects. The parties further agree that the goal of achievement of Commercial Operation within that Budget and schedule is best achieved by an incentive fee program with no provision for additional fee except for "changes".
# WASHINGTON PUBLIC POWER SAFELY SYSTEM ## RICHLAND, WASHINGTON ### AGREEMENT THIS AGREEMENT, made and entered into by and between Washington Public Power Supply System, a municipal corporation, 3000 George Washington Way, Richland, Washington, hereinafter called the "OWNER", and Mercury Company of Norwood, Incorporated, a corporation, with its principal offices located at 10 Burke Drive, in the City of Brockton, State of Massachusetts, hereinafter called the "CONTRACTOR". ### WITNESSETH WHEREAS, the OWNER has caused the preparation of certain Contract Documents designated "Bidding Documents and Plans and Specifications, Control Boards and Cabinets, Washington Public Power Supply System Nuclear Projects 3 and 5, Conformed Contract No. 3240-59, dated July 26, 1979." WHEREAS, the OWNER has advertised for bids from Bidders of the specified equipment, and has received said bids, has analyzed the same, and has duly given Notice of Award and awarded a Contract to the Contractor as herein set forth and as stated more in detail in the Contract Documents, all of which Contract Documents are attached hereto and made a part of hereof and which constitute the whole contract between OWNER and CONTRACTOR. NOW, THEREFORE, it is hereby agreed that: (a) CONTRACTOR shall furnish all requirements of the Contract in the manner specified in the Contract Documents. (b) OWNER shall pay to CONTRACTOR in accordance with schedule of prices at the time and in the manner and upon the A-1
# III. BACKGROUND (Continued)
A. Sequence of Events (Continued)
6. Contractor provided cost summary in WZUE-82-012 dated December 7, 1982 (Attachment 7). The letter gives the non recurring cost (and its breakdown) from which the Contractor estimated to obtain the Contract Price.
7. Additional information from Contractor via WZUE-83-001 dated February 3, 1983 (Attachment 8) supplementing the December 7, 1982 proposal.
8. Additional information from Contractor via WZUE-83-004 dated February 22, 1983 (Attachment 9).
9. Fact Finding Meeting, of April 13, 1983 documented in (Attachment 10).
10. Memo to file dated June 21, 1983 (Attachment 11)
B. Status of Equipment, Engineering, Material, Manufacturing
| Status |
| :--: |
| 1. | Equipment | WNP-1 | WNP-4 |
| :--: | :--: | :--: | :--: |
| | Cabinet Assemblies (SREX \& SREY) | Delivered | Not Started* |
| | Prefab Instr. Cables (SREX \& SREY) | Delivered | Not Started* |
| | Safety Related Accessory Cabinet (SRAC) | Delivered | Not Started* |
| | Ftbre Optic Links (FOL) | Delivered | Not Started* |
| | Radwaste Instr. Cabinet Assembly (RWIC) | Delivered | Not Started* |
| | BOP Instr. Cabinet Assy. (BOPC) | Delivered | Not Started* |
| | Prefab Instr. Cables BOPC | $\begin{aligned} & 2-3 \text { mo. after } \\ & \text { Dwg approval } \end{aligned}$ | Not Started* |
| | PAS Cabinets | Delivered | Delivered |
* (Will not be completed due to termination).
2.
| Engineering | Status |
| :-- | :-- |
All Engineering including design, development and qualification work will not be impacted by WNP-4 termination.
a) Design and Development
- Seismic Testing/Aging Ongoing
- Test Instructions Complete
- Drawing Documentation 95\% Complete Table
TABLE 1. Degrees awarded in all fields and in science and engineering fields, by degree level: 1966-2012
| Academic year ending | Bachelor's | Master's | Doctorate | ||||||
|---|---|---|---|---|---|---|---|---|---|
| All degrees ${ }^{a}$ | S&E degrees | % S&E degrees | All degrees ${ }^{a}$ | S&E degrees | % S&E degrees | All degrees | S&E degrees | % S&E degrees | |
| 1966 | 524,008 | 184,313 | 35.2 | 140,772 | 41,049 | 29.2 | 17,949 | 11,570 | 64.5 |
| 1967 | 562,369 | 199,832 | 35.5 | 157,892 | 44,988 | 28.5 | 20,403 | 13,109 | 64.3 |
| 1968 | 636,863 | 226,597 | 35.6 | 177,150 | 48,760 | 27.5 | 22,937 | 14,645 | 63.8 |
| 1969 | 734,003 | 262,189 | 35.7 | 194,414 | 52,382 | 26.9 | 25,743 | 16,288 | 63.3 |
| 1970 | 798,070 | 284,230 | 35.6 | 209,387 | 53,695 | 25.6 | 29,498 | 18,052 | 61.2 |
| 1971 | 846,110 | 294,357 | 34.8 | 231,486 | 56,454 | 24.4 | 31,867 | 19,381 | 60.8 |
| 1972 | 894,110 | 306,459 | 34.3 | 252,774 | 60,049 | 23.8 | 33,041 | 19,342 | 58.5 |
| 1973 | 930,272 | 321,085 | 34.5 | 264,525 | 62,046 | 23.5 | 33,755 | 19,373 | 57.4 |
| 1974 | 954,376 | 326,230 | 34.2 | 278,259 | 62,239 | 22.4 | 33,047 | 18,714 | 56.6 |
| 1975 | 931,663 | 313,555 | 33.7 | 293,651 | 63,198 | 21.5 | 32,952 | 18,799 | 57.0 |
| 1976 | 934,443 | 309,491 | 33.1 | 313,001 | 65,007 | 20.8 | 32,946 | 18,472 | 56.1 |
| 1977 | 928,228 | 303,798 | 32.7 | 318,241 | 67,397 | 21.2 | 31,716 | 18,008 | 56.8 |
| 1978 | 930,201 | 303,555 | 32.6 | 312,816 | 67,264 | 21.5 | 30,875 | 17,653 | 57.2 |
| 1979 | 931,340 | 303,162 | 32.6 | 302,075 | 64,226 | 21.3 | 31,238 | 17,872 | 57.2 |
| 1980 | 940,251 | 304,695 | 32.4 | 299,095 | 64,089 | 21.4 | 31,019 | 17,775 | 57.3 |
| 1981 | 946,877 | 306,792 | 32.4 | 296,798 | 64,366 | 21.7 | 31,355 | 18,257 | 58.2 |
| 1982 | 964,043 | 315,023 | 32.7 | 296,580 | 66,568 | 22.4 | 31,109 | 18,274 | 58.7 |
| 1983 | 980,679 | 317,571 | 32.4 | 290,931 | 67,733 | 23.3 | 31,280 | 18,634 | 59.6 |
| 1984 | 986,345 | 324,284 | 32.9 | 285,462 | 68,582 | 24.0 | 31,334 | 18,745 | 59.8 |
| 1985 | 990,877 | 332,273 | 33.5 | 287,213 | 70,578 | 24.6 | 31,295 | 18,934 | 60.5 |
| 1986 | 1,000,204 | 335,405 | 33.5 | 289,829 | 71,840 | 24.8 | 31,897 | 19,435 | 60.9 |
| 1987 | 1,003,532 | 331,526 | 33.0 | 290,532 | 72,603 | 25.0 | 32,365 | 19,892 | 61.5 |
| 1988 | 1,006,033 | 322,482 | 32.1 | 300,091 | 73,655 | 24.5 | 33,497 | 20,930 | 62.5 |
| 1989 | 1,030,171 | 322,821 | 31.3 | 311,050 | 76,425 | 24.6 | 34,324 | 21,731 | 63.3 |
| 1990 | 1,062,151 | 329,094 | 31.0 | 324,947 | 77,788 | 23.9 | 36,066 | 22,868 | 63.4 |
| 1991 | 1,107,997 | 337,675 | 30.5 | 338,498 | 78,368 | 23.2 | 37,530 | 24,019 | 64.0 |
| 1992 | 1,150,072 | 355,265 | 30.9 | 354,207 | 81,107 | 22.9 | 38,887 | 24,674 | 63.5 |
| 1993 | 1,179,278 | 366,035 | 31.0 | 370,973 | 86,425 | 23.3 | 39,799 | 25,442 | 63.9 |
| 1994 | 1,183,141 | 373,261 | 31.5 | 389,008 | 91,411 | 23.5 | 41,033 | 26,203 | 63.9 |
| 1995 | 1,174,436 | 378,148 | 32.2 | 399,428 | 94,309 | 23.6 | 41,747 | 26,535 | 63.6 |
| 1996 | 1,179,815 | 384,674 | 32.6 | 408,932 | 95,313 | 23.3 | 42,437 | 27,240 | 64.2 |
| 1997 | 1,186,589 | 388,482 | 32.7 | 420,954 | 93,485 | 22.2 | 42,538 | 27,228 | 64.0 |
| 1998 | 1,199,579 | 390,618 | 32.6 | 431,871 | 93,918 | 21.7 | 42,638 | 27,274 | 64.0 |
| 1999 | NA | NA | NA | NA | NA | NA | 41,099 | 25,930 | 63.1 |
| 2000 | 1,254,618 | 398,602 | 31.8 | 460,142 | 96,230 | 20.9 | 41,372 | 25,966 | 62.8 |
| 2001 | 1,260,308 | 400,435 | 31.8 | 471,329 | 99,528 | 21.1 | 40,745 | 25,530 | 62.7 |
| 2002 | 1,308,970 | 415,983 | 31.8 | 485,535 | 99,650 | 20.5 | 40,033 | 24,610 | 61.5 |
| 2003 | 1,365,694 | 442,755 | 32.4 | 516,098 | 108,355 | 21.0 | 40,766 | 25,283 | 62.0 |
| 2004 | 1,417,421 | 458,658 | 32.4 | 562,862 | 119,296 | 21.2 | 42,123 | 26,275 | 62.4 |
| 2005 | 1,456,401 | 470,214 | 32.3 | 578,964 | 120,870 | 20.9 | 43,384 | 27,985 | 64.5 |
| 2006 | 1,502,922 | 478,858 | 31.9 | 599,365 | 120,999 | 20.2 | 45,624 | 29,873 | 65.5 |
| 2007 | 1,541,704 | 485,772 | 31.5 | 610,469 | 120,278 | 19.7 | 48,133 | 31,836 | 66.1 |
| 2008 | 1,580,413 | 496,168 | 31.4 | 631,711 | 126,404 | 20.0 | 48,778 | 32,837 | 67.3 |
| 2009 | 1,619,028 | 505,435 | 31.2 | 665,473 | 134,517 | 20.2 | 49,553 | 33,463 | 67.5 |
JSON Output
{
"document_type": "Table",
"description": "Degrees awarded in all fields and in science and engineering fields, by degree level: 1966–2012",
"extract_1990_bachelor_all_degrees": "1,062,151"
} Raw Markdown
TABLE 1. Degrees awarded in all fields and in science and engineering fields, by degree level: 1966-2012
| Academic year ending | Bachelor's | | | Master's | | | Doctorate | | |
| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |
| | All degrees ${ }^{a}$ | S\&E degrees | \% S\&E degrees | All degrees ${ }^{a}$ | S\&E degrees | \% S\&E degrees | All degrees | S\&E degrees | \% S\&E degrees |
| 1966 | 524,008 | 184,313 | 35.2 | 140,772 | 41,049 | 29.2 | 17,949 | 11,570 | 64.5 |
| 1967 | 562,369 | 199,832 | 35.5 | 157,892 | 44,988 | 28.5 | 20,403 | 13,109 | 64.3 |
| 1968 | 636,863 | 226,597 | 35.6 | 177,150 | 48,760 | 27.5 | 22,937 | 14,645 | 63.8 |
| 1969 | 734,003 | 262,189 | 35.7 | 194,414 | 52,382 | 26.9 | 25,743 | 16,288 | 63.3 |
| 1970 | 798,070 | 284,230 | 35.6 | 209,387 | 53,695 | 25.6 | 29,498 | 18,052 | 61.2 |
| 1971 | 846,110 | 294,357 | 34.8 | 231,486 | 56,454 | 24.4 | 31,867 | 19,381 | 60.8 |
| 1972 | 894,110 | 306,459 | 34.3 | 252,774 | 60,049 | 23.8 | 33,041 | 19,342 | 58.5 |
| 1973 | 930,272 | 321,085 | 34.5 | 264,525 | 62,046 | 23.5 | 33,755 | 19,373 | 57.4 |
| 1974 | 954,376 | 326,230 | 34.2 | 278,259 | 62,239 | 22.4 | 33,047 | 18,714 | 56.6 |
| 1975 | 931,663 | 313,555 | 33.7 | 293,651 | 63,198 | 21.5 | 32,952 | 18,799 | 57.0 |
| 1976 | 934,443 | 309,491 | 33.1 | 313,001 | 65,007 | 20.8 | 32,946 | 18,472 | 56.1 |
| 1977 | 928,228 | 303,798 | 32.7 | 318,241 | 67,397 | 21.2 | 31,716 | 18,008 | 56.8 |
| 1978 | 930,201 | 303,555 | 32.6 | 312,816 | 67,264 | 21.5 | 30,875 | 17,653 | 57.2 |
| 1979 | 931,340 | 303,162 | 32.6 | 302,075 | 64,226 | 21.3 | 31,238 | 17,872 | 57.2 |
| 1980 | 940,251 | 304,695 | 32.4 | 299,095 | 64,089 | 21.4 | 31,019 | 17,775 | 57.3 |
| 1981 | 946,877 | 306,792 | 32.4 | 296,798 | 64,366 | 21.7 | 31,355 | 18,257 | 58.2 |
| 1982 | 964,043 | 315,023 | 32.7 | 296,580 | 66,568 | 22.4 | 31,109 | 18,274 | 58.7 |
| 1983 | 980,679 | 317,571 | 32.4 | 290,931 | 67,733 | 23.3 | 31,280 | 18,634 | 59.6 |
| 1984 | 986,345 | 324,284 | 32.9 | 285,462 | 68,582 | 24.0 | 31,334 | 18,745 | 59.8 |
| 1985 | 990,877 | 332,273 | 33.5 | 287,213 | 70,578 | 24.6 | 31,295 | 18,934 | 60.5 |
| 1986 | 1,000,204 | 335,405 | 33.5 | 289,829 | 71,840 | 24.8 | 31,897 | 19,435 | 60.9 |
| 1987 | 1,003,532 | 331,526 | 33.0 | 290,532 | 72,603 | 25.0 | 32,365 | 19,892 | 61.5 |
| 1988 | 1,006,033 | 322,482 | 32.1 | 300,091 | 73,655 | 24.5 | 33,497 | 20,930 | 62.5 |
| 1989 | 1,030,171 | 322,821 | 31.3 | 311,050 | 76,425 | 24.6 | 34,324 | 21,731 | 63.3 |
| 1990 | 1,062,151 | 329,094 | 31.0 | 324,947 | 77,788 | 23.9 | 36,066 | 22,868 | 63.4 |
| 1991 | 1,107,997 | 337,675 | 30.5 | 338,498 | 78,368 | 23.2 | 37,530 | 24,019 | 64.0 |
| 1992 | 1,150,072 | 355,265 | 30.9 | 354,207 | 81,107 | 22.9 | 38,887 | 24,674 | 63.5 |
| 1993 | 1,179,278 | 366,035 | 31.0 | 370,973 | 86,425 | 23.3 | 39,799 | 25,442 | 63.9 |
| 1994 | 1,183,141 | 373,261 | 31.5 | 389,008 | 91,411 | 23.5 | 41,033 | 26,203 | 63.9 |
| 1995 | 1,174,436 | 378,148 | 32.2 | 399,428 | 94,309 | 23.6 | 41,747 | 26,535 | 63.6 |
| 1996 | 1,179,815 | 384,674 | 32.6 | 408,932 | 95,313 | 23.3 | 42,437 | 27,240 | 64.2 |
| 1997 | 1,186,589 | 388,482 | 32.7 | 420,954 | 93,485 | 22.2 | 42,538 | 27,228 | 64.0 |
| 1998 | 1,199,579 | 390,618 | 32.6 | 431,871 | 93,918 | 21.7 | 42,638 | 27,274 | 64.0 |
| 1999 | NA | NA | NA | NA | NA | NA | 41,099 | 25,930 | 63.1 |
| 2000 | 1,254,618 | 398,602 | 31.8 | 460,142 | 96,230 | 20.9 | 41,372 | 25,966 | 62.8 |
| 2001 | 1,260,308 | 400,435 | 31.8 | 471,329 | 99,528 | 21.1 | 40,745 | 25,530 | 62.7 |
| 2002 | 1,308,970 | 415,983 | 31.8 | 485,535 | 99,650 | 20.5 | 40,033 | 24,610 | 61.5 |
| 2003 | 1,365,694 | 442,755 | 32.4 | 516,098 | 108,355 | 21.0 | 40,766 | 25,283 | 62.0 |
| 2004 | 1,417,421 | 458,658 | 32.4 | 562,862 | 119,296 | 21.2 | 42,123 | 26,275 | 62.4 |
| 2005 | 1,456,401 | 470,214 | 32.3 | 578,964 | 120,870 | 20.9 | 43,384 | 27,985 | 64.5 |
| 2006 | 1,502,922 | 478,858 | 31.9 | 599,365 | 120,999 | 20.2 | 45,624 | 29,873 | 65.5 |
| 2007 | 1,541,704 | 485,772 | 31.5 | 610,469 | 120,278 | 19.7 | 48,133 | 31,836 | 66.1 |
| 2008 | 1,580,413 | 496,168 | 31.4 | 631,711 | 126,404 | 20.0 | 48,778 | 32,837 | 67.3 |
| 2009 | 1,619,028 | 505,435 | 31.2 | 665,473 | 134,517 | 20.2 | 49,553 | 33,463 | 67.5 | Invoice
| BONNEVILLE POWER ADMINISTRATION RMGC | AGENCY NO | CONTRACT | INVOICE NUMBER |
|---|---|---|---|
| ATTN: ROBERT MOULTON, COTR | 077 | 86-59 | 07-0010 |
| P.O. BOX 3621 | |||
| PORTLAND, OREGONN 97208-3621 |
VENDOR: WASHINGTON STATE ENERGY OFFICE 809 LEGION WAY SE FA-11 OLYMPIA, WASHINGTON 98504-1211
FEDERAL ID 91-0950059 12/31/91 REGIONAL GEOTHERMAL ASSESSMENT BPA AGREEMENT 87 BP 66141
| APPROVED BUDGET | CUMULATIVE TOTAL | PREVIOUS BILLED | CURRENT TOTAL | |
|---|---|---|---|---|
| SALARIES | 230725.00 | 177,904.64 | 172,406.84 | 5,497.80 |
| FRINGE | 52763.00 | 41,496.03 | 40,049.66 | 1,446.37 |
| TRAVEL | 52323.00 | 42,938.52 | 42,589.86 | 348.66 |
| CONTRACTS | 359286.00 | 283,361.02 | 279,839.95 | 3,521.07 |
| LESS EQUIP PURCHASES | (18,600.00) | (18,600.00) | ||
| LESS EQUIP PURCHASES | (19,895.00) | (19,895.00) | ||
| SUPPLIES | 536.00 | |||
| MISCELLANEOUS | 23891.00 | 25,482.20 | 23,737.49 | 1,744.71 |
| EQUIPMENT 90,695.00 | ||||
| ST OF IDAHO EQUIP | 18,600.00 | 18,600.00 | ||
| ST OF MONTANA EQUIP | 19,895.00 | 19,895.00 | ||
| PLOTTER | ||||
| WSEO #D204890 | 6,579.20 | 6,579.20 | 0.00 | |
| WSEO #D205042 8,000.00 | 8,000.00 | 8,000.00 | ||
| WSEO #D204960 EQUIP | 39,347.00 | 39,347.00 | ||
| WSEO #D204901 | ||||
| WSEO USE TAX | 165.66 | 165.66 | 0.00 | |
| WSEO #D204041 27,417.06 | 7,619.90 | 7,619.90 | 0.00 | |
| WSEO D205382 | 1,208.68 | 1,208.68 | 0.00 | |
| WSEO D205383 | 1,208.67 | 1,208.67 | 0.00 | |
| WSEO D205106 | 1,286.42 | 1,286.42 | 0.00 | |
| WSEO D205393 | 1,286.41 | 1,286.41 | 0.00 | |
| WSEO D204406 | 15,539.00 | 15,539.00 | 0.00 | |
| TOTAL EQUIPMENT BUDGET | 126,112.06 | 0.00 | ||
| INDIRECT | 208,672.00 | 161,337.97 | 157,398.51 | 3,939.46 |
| TOTAL | 1,054,308.06 | 814,761.32 | 798,263.25 | 16,498.07 |
JSON Output
{
"document_type": "Invoice",
"description": "Regional Geothermal Assessment BPA Agreement 87 BP 66141",
"author": "Washington State Energy Office",
"contract_number": "86-59",
"invoice_number": "07-00010",
"agency_no": "077",
"total_amount": "16,498.07"
} Raw Markdown
| BONNEVILLE POWER ADMINISTRATION RMGC | AGENCY NO | CONTRACT | INVOICE NUMBER | | --- | --- | --- | --- | | ATTN: ROBERT MOULTON, COTR | 077 | 86-59 | 07-0010 | | P.O. BOX 3621 | | | | | PORTLAND, OREGONN 97208-3621 | | | | VENDOR: WASHINGTON STATE ENERGY OFFICE 809 LEGION WAY SE FA-11 OLYMPIA, WASHINGTON 98504-1211 FEDERAL ID 91-0950059 12/31/91 REGIONAL GEOTHERMAL ASSESSMENT BPA AGREEMENT 87 BP 66141 | | APPROVED BUDGET | CUMULATIVE TOTAL | PREVIOUS BILLED | CURRENT TOTAL | | --- | --- | --- | --- | --- | | SALARIES | 230725.00 | 177,904.64 | 172,406.84 | 5,497.80 | | FRINGE | 52763.00 | 41,496.03 | 40,049.66 | 1,446.37 | | TRAVEL | 52323.00 | 42,938.52 | 42,589.86 | 348.66 | | CONTRACTS | 359286.00 | 283,361.02 | 279,839.95 | 3,521.07 | | LESS EQUIP PURCHASES | | (18,600.00) | (18,600.00) | | | LESS EQUIP PURCHASES | | (19,895.00) | (19,895.00) | | | SUPPLIES | 536.00 | | | | | MISCELLANEOUS | 23891.00 | 25,482.20 | 23,737.49 | 1,744.71 | | EQUIPMENT 90,695.00 | | | | | | ST OF IDAHO EQUIP | | 18,600.00 | 18,600.00 | | | ST OF MONTANA EQUIP | | 19,895.00 | 19,895.00 | | | PLOTTER | | | | | | WSEO #D204890 | | 6,579.20 | 6,579.20 | 0.00 | | WSEO #D205042 8,000.00 | | 8,000.00 | 8,000.00 | | | WSEO #D204960 EQUIP | | 39,347.00 | 39,347.00 | | | WSEO #D204901 | | | | | | WSEO USE TAX | | 165.66 | 165.66 | 0.00 | | WSEO #D204041 27,417.06 | | 7,619.90 | 7,619.90 | 0.00 | | WSEO D205382 | | 1,208.68 | 1,208.68 | 0.00 | | WSEO D205383 | | 1,208.67 | 1,208.67 | 0.00 | | WSEO D205106 | | 1,286.42 | 1,286.42 | 0.00 | | WSEO D205393 | | 1,286.41 | 1,286.41 | 0.00 | | WSEO D204406 | | 15,539.00 | 15,539.00 | 0.00 | | TOTAL EQUIPMENT BUDGET | 126,112.06 | | | 0.00 | | INDIRECT | 208,672.00 | 161,337.97 | 157,398.51 | 3,939.46 | | TOTAL | 1,054,308.06 | 814,761.32 | 798,263.25 | 16,498.07 |
Handwriting
MISTRAL AI
$\operatorname{sin}^{2} \theta+\cos ^{2} \theta=1$
$a x^{2}+b x+c=0$
$a\left(x^{2}+\frac{b x}{a}+\frac{c}{a}\right)=0$
$x^{2}+2 \cdot \frac{b}{a} x+\left(\frac{b}{a}\right)^{2}-\left(\frac{b}{2 a}\right)^{2}+\frac{c}{a}=0$
$\left(\frac{x+b}{2 a}\right)^{2}-\frac{b^{2}-4 a c}{4 a^{2}}=0$
$\left(x+\frac{b}{2 a}-\frac{\sqrt{b^{2}-4 a c}}{2 a}\right)\left(x+\frac{b}{2 a}+\frac{\sqrt{b^{2}-4 a c}}{2 a}\right)$
JSON Output
{
"description": "The image shows a step-by-step derivation of the quadratic formula. It starts with the general form of a quadratic equation, ax² + bx + c = 0, and proceeds to complete the factorization. The steps include dividing by 'a', completing the square, and rearranging terms to isolate the squared term. Finally, it arrives at the quadratic formula: x = [-b ± √(b² - 4ac)] / (2a)."
} Raw Markdown
# MISTRAL AI
$\operatorname{sin}^{2} \theta+\cos ^{2} \theta=1$
$a x^{2}+b x+c=0$
$a\left(x^{2}+\frac{b x}{a}+\frac{c}{a}\right)=0$
$x^{2}+2 \cdot \frac{b}{a} x+\left(\frac{b}{a}\right)^{2}-\left(\frac{b}{2 a}\right)^{2}+\frac{c}{a}=0$
$\left(\frac{x+b}{2 a}\right)^{2}-\frac{b^{2}-4 a c}{4 a^{2}}=0$
$\left(x+\frac{b}{2 a}-\frac{\sqrt{b^{2}-4 a c}}{2 a}\right)\left(x+\frac{b}{2 a}+\frac{\sqrt{b^{2}-4 a c}}{2 a}\right)$ Pourquoi choisir Mistral pour Document AI ?
Précision supérieure des documents.
Extrayez et analysez des textes complexes, des écritures manuscrites, des tableaux et des images à partir de n'importe quel document, avec une précision supérieure à 99 % dans toutes les langues du monde.
Un traitement plus rapide, à un coût prévisible.
Traitez jusqu'à 2 000 pages par minute sur un seul GPU, avec une latence minimale et un débit économique.
Transformez vos opérations documentaires pour gagner en évolutivité et en intelligence.
Intégrez l'OCR aux puissants outils d'IA de Mistral pour mettre en place des flux de travail flexibles couvrant l'ensemble du cycle de vie des documents et rendre vos archives instantanément accessibles.
Pour les secteurs qui exigent précision, rapidité et conformité dans leurs flux de travail documentaires.
Les secteurs réglementés nécessitant une extraction de données prête pour l'audit.
Les entreprises internationales traitant de grands volumes de documents multilingues.
Les chercheurs et les établissements universitaires transformant des fichiers PDF en ensembles de données structurés.
Les organisations pour lesquelles la conformité est une priorité et qui ont besoin d'un déploiement sur site sécurisé.
Déploiements sécurisés.
Déployez Document AI sur site ou dans un cloud privé afin de répondre aux exigences strictes en matière de conformité et de souveraineté des données.
Cas d'utilisation.
De la documentation aux données, à grande échelle.
Numérisez des fichiers PDF, scannés, DOCX, PPTX et des documents manuscrits. Extrayez des données au format JSON structuré à l'aide de modèles personnalisés, analysez des formulaires, classez des documents et traitez des images jusqu'aux graphiques, signatures et mentions en petits caractères.
Extraire et analyser.
Analysez des tableaux, des formulaires, des factures et des mises en page complexes. Identifiez des schémas, validez les données et rendez les archives numérisées accessibles.
Traduire et localiser.
Une précision de plus de 99 % dans plus de 11 langues. Localisez les contrats, les rapports et la correspondance avec une précision conforme aux exigences légales.
Automatiser les workflows grâce à l'IA.
Créez des pipelines de documents de bout en bout : Numérisation par OCR, structuration automatisée et requête en langage naturel.
Surveiller la conformité et gérer les risques.
Contrôlez les flux de documents, masquez les données sensibles et appliquez les politiques de conservation avec une traçabilité totale.
Découvrir Document AI.
Testez Document AI dans Mistral Studio.
Découvrez le tarif de l'API.
Contactez-nous pour discuter des déploiements en entreprise.
Extrayez du texte structuré à partir d'un fichier PDF tout en préservant les mises en page.
Annotez des zones sélectionnées ou des documents entiers.
Posez des questions et extrayez des informations à partir de documents en utilisant un langage naturel.
Traitez des documents en masse avec l'OCR par lots
Extraction de données avec des résultats structurés
Comprendre les documents grâce à des questions-réponses ou à des résumés
Prêt à vous lancer ?
Bénéficiez d'un traitement de documents de niveau professionnel grâce à une technologie OCR de pointe.




